USDR1 located at Badger Island. USDR2 located at Salt Lake City landfill. USDR3 located near Syracuse DAQ
Loading the image may take longer when requesting a lot of data. Maximum period for plotting is 4 days.
Click on the image to see it at full resolution.
Sodar data are plotted at intervals of 5, 15, 30, 60, 180, or 360 min from the requested begin time to end time. All observations are plotted when 5 min selected, otherwise the median values within the selected range (15-360min) are plotted.
The plot defaults to the most recent 12 hours worth of observations with 30 minute resolution and a signal to noise ratio (SNR)
threshold of 5. The SNR threshold is a way to filter out potentially bad data. All observations with an SNR greater than the
selected threshold will be plotted when 5 min option used. Otherwise, the SNR for the median must exceed the threshhold.. A threshold of 00 will allow all observations to be plotted for wind speeds below 20 m/s.
Try to keep the density of your requested observations in mind and plotting over long time intervals may take a while to process.
Data are available from January 1st, 2015 onward but the SO3S period is primarily from June-August 2015.
Send any questions/concerns to john.horel@utah.edu.