BMBB91 KMSO 041525 STQMSO A SPOT FORECAST REQUEST HAS JUST BEEN RECEIVED FOR A WILDFIRE NAMED "Prisoner Lake Fire" PRIORITY: IMMEDIATE DATE: 8/4/12 TIME: 0925 PROJECT NAME: Prisoner Lake Fire PROJECT TYPE: WILDFIRE REQUESTING AGENCY: USFS REQUESTING OFFICIAL: Seth Carbonari REQUEST REASON: WILDFIRE FAX: (406) 758-5390 EMERGENCY PHONE: (406) 758-6461 LOCATION: SEC32 T21N R12W STATE: MT DLAT: 47.52152 DLON: 113.17115 EXPOSURE: SW FUEL TYPE: Timber SHELTERING: UNSHELTERED BOTTOM ELEVATION: 6000 TOP ELEVATION: 7900 SIZE (ACRES): 3333 WEATHER CONDITIONS AT PROJECT OR FROM NEARBY STATIONS Upper 1/3 ELEV=7600 TIME=1500 WIND=1-2 W T=59 TW=45 RH=36 TD= 60% Upper 1/3 ELEV=7600 TIME=1700 WIND=1-3W T=65 TW=47 RH=27 TD= ELEV= TIME= WIND= T= TW= RH= TD= ELEV= TIME= WIND= T= TW= RH= TD= ...REMARKS... Observations were taken on the western ridge of the fire between the South Fork of Flathead River and the South Fork of the White River. ...WEATHER PARAMETERS REQUESTED... CLOUDS / WEATHER: 1,1,1 CHANCE OF WETTING RAIN: 1,1,1 TEMPERATURE: 1,1,1 RELATIVE HUMIDITY: 1,1,1 20 FOOT WIND: 1,1,1 SMOKE DISPERSION: 1,1,1 SITE: MSO OFILE: 20120804.PRISO.01 TIMEZONE: MST7MDT