BMBB91 KPQR 100332 STQPQR A SPOT FORECAST REQUEST HAS JUST BEEN RECEIVED FOR A WILDFIRE NAMED "Buckhead" PRIORITY: IMMEDIATE DATE: 8/9/12 TIME: 2032 PROJECT NAME: Buckhead PROJECT TYPE: WILDFIRE REQUESTING AGENCY: Willamette National Forest REQUESTING OFFICIAL: Shalyn Whitson REQUEST REASON: WILDFIRE FAX: (541) 225-6221 EMERGENCY PHONE: (541) 225-6400 LOCATION: STATE: OR DLAT: 43.7932 DLON: 122.4937 EXPOSURE: east FUEL TYPE: timber SHELTERING: FULL BOTTOM ELEVATION: 2500 TOP ELEVATION: 3500 SIZE (ACRES): 9 WEATHER CONDITIONS AT PROJECT OR FROM NEARBY STATIONS level w fire ELEV=3000 TIME=1200 WIND=0-3upslope T=61 TW=50 RH=47 TD= Mostly Clear level w fire ELEV=3000 TIME=1400 WIND=0-3upslope T=66 TW=53 RH=43 TD= Mostly Clear ELEV=3000 TIME=1500 WIND=0-3upslope T=71 TW=58 RH=46 TD= Mostly Clear ELEV=3000 TIME=1700 WIND=0-3 so/ea T=71 TW=58 RH=46 TD= Mostly Clear ...REMARKS... ...WEATHER PARAMETERS REQUESTED... CLOUDS / WEATHER: 0,1,1 CHANCE OF WETTING RAIN: 0,1,1 TEMPERATURE: 0,1,1 RELATIVE HUMIDITY: 0,1,1 EYE LEVEL WIND: 0,1,1 20 FOOT WIND: 0,1,1 VISIBILITY: 0,1,1 CEILING: 0,1,1 SWELL HEIGHT: 0,0,0 SWELL PERIOD: 0,0,0 WIND WAVE: 0,0,0 SITE: PQR OFILE: 20120809.BUCKH.01 TIMEZONE: PST8PDT