BMBB91 KFGZ 272101 STQFGZ A SPOT FORECAST REQUEST FOR PROJECT "Doce Fire" HAS BEEN MODIFIED PRIORITY: IMMEDIATE DATE: 6/27/13 TIME: 1401 PROJECT NAME: Doce Fire PROJECT TYPE: WILDFIRE REQUESTING AGENCY: USFS REQUESTING OFFICIAL: Todd Bentley PSC REQUEST REASON: WILDFIRE FAX: EMERGENCY PHONE: (928) 713-0212 LOCATION: STATE: AZ DLAT: 34.595 DLON: 112.59611 EXPOSURE: All FUEL TYPE: Brush SHELTERING: PARTIAL BOTTOM ELEVATION: 5000 TOP ELEVATION: 7626 SIZE (ACRES): 6767 WEATHER CONDITIONS AT PROJECT OR FROM NEARBY STATIONS Granite Basin ELEV=5978 TIME=1100 WIND= T=90 TW=63 RH=23 TD= 10% cover with high thin cloud Granite Basin ELEV=5978 TIME=1400 WIND=S 0-5 T=95 TW=65 RH=21 TD= Same North perimeter ELEV=4953 TIME=1300 WIND=S 2-4 T=94 TW=63 RH=18 TD= Same ELEV= TIME= WIND= T= TW= RH= TD= ...REMARKS... Needed for tomorrows 6/28 Incident Action Plan by 1800 if possible. Will have weather observations to include this afternoon and will update request if needed. ...WEATHER PARAMETERS REQUESTED... CLOUDS / WEATHER: 1,1,1 TEMPERATURE: 1,1,1 RELATIVE HUMIDITY: 1,1,1 20-FOOT WIND: 1,1,1 LIGHTNING ACTIVITY LEVEL: 1,1,1 HAINES INDEX: 1,1,1 VENTILATION RATE: 0,0,0 CLEARING INDEX: 0,0,0 MIXING HEIGHT: 0,0,0 TRANSPORT WINDS: 0,0,0 SITE: FGZ OFILE: 20130627.DOCEF.01 TIMEZONE: MST7