BMBB91 KMFR 042236 STQMFR A SPOT FORECAST REQUEST FOR PROJECT "BBOP_DouglasComplex" HAS BEEN MODIFIED PRIORITY: IMMEDIATE DATE: 8/4/13 TIME: 1536 PROJECT NAME: BBOP_DouglasComplex PROJECT TYPE: WILDFIRE REQUESTING AGENCY: BNL_DOE REQUESTING OFFICIAL: Art Sedlacek REQUEST REASON: WILDFIRE FAX: (631) 344-2887 EMERGENCY PHONE: (516) 528-4515 LOCATION: STATE: OR DLAT: 42.859 DLON: 123.379 EXPOSURE: SW/E/SE FUEL TYPE: Timber SHELTERING: BOTTOM ELEVATION: 1000 TOP ELEVATION: 3500 SIZE (ACRES): 34450 WEATHER CONDITIONS AT PROJECT OR FROM NEARBY STATIONS ELEV= TIME= WIND= T= TW= RH= TD= ELEV= TIME= WIND= T= TW= RH= TD= ELEV= TIME= WIND= T= TW= RH= TD= ELEV= TIME= WIND= T= TW= RH= TD= ...REMARKS... Would appreciate having this by 9:00 am EDT on Monday morning August 5, 2013 If possible, also include: 20-foot winds Mixing height transport winds Tom- voice mail cut out before it recorded your phone number. Please call back if you need to. This request is in support of DOE-sponsored aircraft-based aerosol study of biomass burn emissions ...WEATHER PARAMETERS REQUESTED... SKY / WEATHER: 0,0,1 TEMPERATURE: 0,0,1 RELATIVE HUMIDITY: 0,0,1 EYE LEVEL WIND: 0,0,1 SMOKE DISPERSION: 0,0,1 CHANCE OF WETTING RAIN: 0,0,1 LIGHTNING ACTIVITY LEVEL: 0,0,1 VISIBILITY: 0,0,1 CEILING: 0,0,1 SWELL HEIGHT: 0,0,1 SWELL PERIOD: 0,0,0 WIND WAVE: 0,0,0 SITE: MFR OFILE: 20130804.BBOP_.01 TIMEZONE: PST8PDT